STRABAG wins major €153m motorway contract in Poland
Photo Credit To STRABAG SE

STRABAG wins major €153m motorway contract in Poland

STRABAG wins major €153m motorway contract in Poland

STRABAG, the European-based construction technology group, has won a large motorway construction contract in Poland.

The group’s Polish subsidiary was awarded the € 153 million design-and-build contract by the country’s General Directorate for National Roads and Motorways (GDDKiA). The 18.75 km section of the A2 between Siedlce West and Malinowiec is to be completed by the end of 2024.

“We are pleased to have been awarded another important section of Poland’s transportation infrastructure network. Currently we are working on twelve expressway and motorway sections in Poland with a total length of more than 161 km,” says Thomas Birtel, CEO of STRABAG SE.

STRABAG wins major €153m motorway contract in Poland

Dual carriageway along new route

The contract calls for a dual carriageway with two lanes in each direction to be built along a completely new route.

Space for a possible third lane is already covered in the design.

The contract also includes the Siedlce South exit, two rest areas and a motorway service station.

The Project

  • STRABAG UNIT: STRABAG Sp. z o.o
  • CONTRACT VALUE: € 153 million (PLN 700 million)
  • STRABAG SHARE: 100 %
  • ORDER BACKLOG: Q2/21
  • CLIENT: General Directorate for National Roads and Motorways (GDDKiA)

Post source : STRABAG SE

About The Author

Anthony has worked in the construction industry for many years and looks forward to bringing you news and stories on the highways industry from all over the world.

Related posts